Project History


2016
Mast Pulled and Inspected
Mast Step Replace/Rebuild (White Oak) w/ New Mast Step Plate
Saloon Stringer/ribs replaced w/ White Oak
Bilge Paint Industrial White
General Maintenance/Lube for Max Prop 
Haul and Bottom Paint
Mirax Diesel Fuel Tank removal
New Mirax 20 gallon Aluminum tank installed
New Return/Supply/Fill fuel lines.
Interior Cushions Removed and Cleaned  

2015
Winter Haul out and Storage
Removal of Dodger frame and Fabric for Cleaning
Reinstall Autopilot near Interior Companionway.
New Aft Line Hangers cockpit
New GFCI after 110 plugs
Shower Sump Pump Replace
New Interior Port Curtains

2014
Raritan PHRKII Toilet Rebuild
Whale Bildge Manual Pump Rebuilt Kit
Forward Anchor Chain Locker rebuild
New LED Dome Lights (x3)
New (2)1.2lb Propane Tanks 
Edison Pedestal Rebuild
Rewire electrical outlets
New Aft 20lb Anchor

2013
Aft Cockpit Floor core dry and reglass.  
Starboard and Port Chainplate Knee cabin rebuild
Starboard and Port Upper Standing Rigging Replaced
New Halyards and Running Rigging
Port Townsend Haul Out - Bottom strip and paint.