| Old Evaporator Box | 
| Vacuuming and Recharging with R134a | 
| New Evaporator Box, Thermostat and frosty conditions | 
| Despite the rusty mess, the glassed in wood floor was completely solid. | 
| New Glass and 3 layers of bi-axial Cloth that I left over from the Chainplate Knee replacement last year. | 
| New Teak Trim trim piece epoxied, a bit of 5200 and some larger bolts. | 
| Starboard side of locker: Access to fresh water tank vent and electrical wiring for the Windlass. I'll replace the old wood cover plate with a Starboard material. | 
![]()  | 
| Repainted the propane locker bottom with Epoxy Appliance Paint | 
![]()  | 
| I decided to service the burners. Disassembled the burners and gas leads and cleaned them all out |